If override charge is selected on a port currently acting as a charge
source, but the attached device is also capable of acting as a source,
request a charge role swap and initiate a pending delayed port override.
If the role swap completes successfully and a charge source is found,
the selected port will become the override port. If the role swap fails
or no charge source is found within 2 seconds, the delayed port override
will be lost.
BUG=chrome-os-partner:28343,chrome-os-partner:31195
TEST=Manual on Samus. Connect two Samus units together through charge
ports.
"pd 1 swap power" - put port on test device into source role
"chgoverride 1" - set charge override, verify that role swap takes
effect and charge manager selects PD charge source, 900mA @ 5V
Disconnect charge cable, verify that charge manager goes back to not
charging.
BRANCH=Samus
Change-Id: Iadcc4dc98631661f254245eeff18973df517f652
Signed-off-by: Shawn Nematbakhsh <shawnn@chromium.org>
Reviewed-on: https://chromium-review.googlesource.com/231900
Reviewed-by: Alec Berg <alecaberg@chromium.org>