Commit Graph

2 Commits

Author SHA1 Message Date
Pete Birley
361aad0789 Gates: Cleanup VM after basic functional test
This ps stops and removes the test VM after we have finished with it.
This frees up resources for the helm tests to use on the small machines
we have avalible in openstack-infra.

Change-Id: I743d8a9271bd349636ffc57e86255cc967633844
2017-06-23 14:18:48 +00:00
Pete Birley
960613e5c6 Boot VM's and basic functional test in Zuul Checks
This PS adds basic vm booting and functional testing to the single node
Zuul gates. Multinode testing will be once we have ceph running in zuul.

Change-Id: Ifcbdcaa4a30dee4088e369d4410dd737ef6f12cd
2017-06-22 14:23:26 -05:00